Generator Projects
  • Hermes Microvision Inc. (HMI) : Taiwan Stock price leader - 500KW CiG Power generator

Hermes Microvision Inc. (HMI) : Taiwan Stock price leader - 500KW CiG Power generator
 

CiG power supplies 500KW DOOSAN Diesel generator set for Hermes Micro-Vision Inc.


We have seen the Construction Board in front of the Job site. It is our pleasure to be generator supplier for Hermes Micro vision


Diesel generator set 500 KW/ parts are well ready to the construction site.


In order to lift the monster equipment like CiG diesel generator, we will need a lift from a giant crane.


We are moving Generator slowly and carefully to the fifth floor of the jobsite.


Firstly we have to lift emission purifier/ fuel tank / catalyst and generator accessories slowly up by the crane.


CiG Engineers monitor the entire progress of the generator installation and ensure efficient, reliable and safe operation.


Generators parts are delivered to the fifth floor under technicians' supervision



Technicians are waiting at fifth floor to receive the generator and accessories.


Now, Diesel Generator Set is slowly moving up to the fifth floor.


Now, Diesel Generator Set is slowly moving up to the fifth floor.


Diesel Generator Set has arrived at fifth floor; Technicians need to ensure the safe landing and then move to its future home


It takes a lot of effort to move around this generator in the messy construction site.


It is difficult for our team to move around this Generator in messy room and hot weather.  Let' s take a look!


These holes on the wall are reserved for the exhaust system in the future


Well prepared spaces for fuel tank


It really takes a while to get our generator to the right position; it is supported by emission purifier on the left corner.


Our team has tried very hard to place Diesel Generator Set on to the generator base no matter how hard it is.


In order to place this Diesel Generator Set to its base, 4 strong men really need to leverage every tool they got available


Once the generator base is ready, Engineers will need to precisely position all equipment according to the project drawing.


There is a magic here, they could only use steel bars to push around such heavy generator.


Generator will be located here, and it will be his sweet home from now on


We must wait for the project owner to confirm where to place the correct spot a vibration pad on the ground.


The project owner has confirmed the correct location to proceed.


Engineers and project owner are discussing on how to install Diesel Particulate Filter and muffler properly.


After placing the vibration pad, this stage indicates that positioning has been successful!


Finally, Diesel Generator Set 500KW has been fixed position at Hermes Micro-Vision Inc(HMI) as below picture

 